Antioch High School

New CTE Facility & Classroom Modernization

This new CTE facility and modernization of an existing classroom space accommodates Antioch High School’s Career Technical Education pathway “Engineering and Designing a Green Environment (EDGE)”. The EDGE Academy strives to engage students in engineering, environmental science and design, preparing them to be innovative leaders and helping them contribute to efforts for a sustainable society through their success in education, career and life. To support this unique program, QKA designed a new facility and modernized existing buildings to provide a variety of spaces, including converting an old District print shop into two flexible project labs and support spaces that provide dynamic environments for the school’s project-based learning educational program.

The new building features a flexible large classroom that adds space for student presentations, events, and professional development, as well as a state-of-the-art ceramics studio. In addition, the existing auto and wood shop classrooms were renovated and ample daylight was added to the previously windowless art classroom.

School District
Antioch Unified School District

Size
5,310 sq.ft. (New Construction)
19,097 (Modernization)

Completion Date
March 2013

Final Construction Cost
$5.4M

Features

High School
New Construction
Modernization
CTE
Fine Art
Woodshop
Robotics

Privacy Settings